Dear Friends,
We are going to test a piping system which includes some underground and aboveground piping sections.
The system shall be tested as one package.
Can we eliminate the weld joints visual inspection for underground portion? (because we have to perform the wrapping before hydrotest)...
Dear friends,
I dont know if this forum is a right place to ask this question or not?
We have a 100m deep water well.
during the pump installation one of the pipes has broken from the flange weld and the pump (together with 3 pipe) was fallen in the well.
now i need an advice how to pull out the...
Dear friends,
I need some information,design basis, PID, PFD and design procedure for sour water accumulation system.
currently, we have a sour water stripper, we want to put an accumulator+pump+air cooled exchanger to send the sour gases to SRP and Flare proportionaly.
Thank you.
Dear Friends,
We are going to establish a new fabrication shop for CS and SS pressure vessels, and Processing Columns.
Could you please tell me how can I find some technical hints about optimum dimensions (like the heigth behind the crane hook, length and weidth,... and layout of the...
Dear Friends,
We have two 48" u/g header and some valves and piping above them.
how can we support valves and piping? we can not implement any foundation for valve or pipe support on the top of U/G pipes.
Thank you
Dear freiends,
I am recently involved in a project to install some air cooled exchanger (Gas Cooler) Fans.
The fans are driven by timing belts throught 2 timing pulley, I am seeking for a procedure or manual for installation and alignment of the system.
Motor and Fan shafts are vertical and...