I have a 1979 Army Corps of Eng Phase 1 Inspection Report that states the analysis conditions for dam to be 1 PMF equals 1250 CSM for 24 hour rainfall of 21.4 inches over an 8.42 sq-mi drainage area... My opinion is that this can not be correct. Either the 1250 CSM is wrong or the 21.4" of...