Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: tbvn
  • Content: Threads
  • Order by date
  1. tbvn

    Scale Problem

    Dear all, I am facing with serious problem with Scale deposit in production flowline( see attached file) and not sure how to solve this problem. We all know that if scale deposit in flow line then it will effect to flow assurance or later on can block flowline.I also took water sample for...
  2. tbvn

    Shutdown philosophy for well testing

    Gents, Our philosophy for existing facilities when the Test separator is shutdown (USD) by PSHH/PSLL/LSLL then the well was flowing into it will auto shut in( close all Xtree valves)and both SDVs at test and production manifold closed, we think this is normal philosophy for all WHP, However as...
  3. tbvn

    Pipe line design

    Gents, Our team is taking over one platform which is under detailed engineering phase,there is an issue that we are facing with, and I need some your advise for this issue: Previously our design for pipe line is suitable with riser 16" wt 25.4 API 5L X60 and MAWP is 238 bar ,however we are...
  4. tbvn

    Heater for flare scr

    All, Is there any requirements for installation of a heater in the condensate flare scrubber. Thanks
  5. tbvn

    Dewatering gas lift pipe line

    Hi all, I am looking for a procedure of dewatering gas lift pipe line.Can some one help me on this issue. Best regards tbvn

Part and Inventory Search