Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: jmas
  • Content: Threads
  • Order by date
  1. jmas

    Engineering Drawings and Tolerances

    Does it required (as a rule) that every technical drawings (with dimension) should have specified condition for tolerancing? In other words can some dimension be left without tolerances?
  2. jmas

    Seawater Intake Pumps

    Does anybody knows why the designer of this intake, decided to have a above-ground discharge for seawater pumps, first, and then let them going U/G after some meters? Let it asked in another way. If the outlet run U/G from the begining, then we have shorter pump, and therefore less material for...
  3. jmas

    Seawater Intake

    Does anybody knows why the designer of this intake, decided to have a above-ground discharge for seawater pumps, first, and then let them going U/G after some meters? Let consider it in another way. If the outlet run U/G from the begining, then we have shorter pump, and therefore less material...
  4. jmas

    ISO 9000/9001/9002 certified US companies

    Does anybody know that what percentage(approx.) of US companies are ISO 9000/9001/9002 certified?
  5. jmas

    Determination of Enclosed Area

    Is there any way to calculate area shown in the attached file, mathematically (not numerically and approximately). The restriction two lines are perpendicular and the arc is circular. Any feedback/reference will be highly appreciated.
  6. jmas

    Why do people give up engineering?

    Good article about engineers trend! http://memagazine.asme.org/Articles/2010/january/Satisfaction.cfm
  7. jmas

    Roof Structure Finite Element Analsis of Cone AST

    Hi Everybody, I've recently engaged to evaluate finite element work of another engineer who designed a roof structure for a 44m dia. and 14.6m height cone roof AST. Merging nodes which was in boundary of roof plate and underlying rafter causes erroneous results from him. So then, i analyzed...
  8. jmas

    Merging Two Different Designs for Seawater Intake

    To set forth my questions it is necessary to have some history. The story is that our company at first won only power generation unit of whole plant, which encompassed once-through cooling system with its own design for seawater intake. After a while we won Desalination system of the plant which...
  9. jmas

    Initial Filling of Empty Space Downstream of Seawater Pumps

    Would someone please tell me why we always first-fill empty spaces of desalination units (or once-through cooling systems) downstream of main seawater pumps? In my thought, it should relate to compressibility feature of air inside of empty space and that emptying that air with high speed make...
  10. jmas

    Initial Filling

    Would someone please tell me why we always first-fill empty spaces of desalination units (or once-through cooling systems) downstream of main seawater pumps? In my thought, it should relate to compressibility feature of air inside of empty space and that emptying that air with high speed make...

Part and Inventory Search