I'm hoping someone here is familiar with this approach. The utility I came from before relocating to Georgia never used such a practice. The basic issue is this: Say you have a transmission substation (100kV and above) that is constructed in the single bus configuration (i'm assuming because...
I saw something yesterday that struck me a little weird. Maybe I just don't remember this from when I was a test engineer or maybe the company I'm with now is doing something different. For those of you familiar with Power Line Carrier applications, you know that besides the radio; we use a...
Does anyone remember the old S&C cap bank protection panel? We used to install them on ungrounded cap banks. It was called 'type UP' or 'UV' or something like that. It had the little extender card setup and a pot that you could null out the slop in the neutral over voltage from the RPD.
My...
This may be a stupid question, but it's one of those things that back when I started; it was "always done this way" and I just never questioned it. Back when I was a Relay Test guy, I noticed that all the CCVT circuits were slugged at the safety disco and #10 circuits were run back to the line...