Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Kowycz
  • Content: Threads
  • Order by date
  1. Kowycz

    Historical Rainfall Intensity Data

    What I am looking for is a database that contains historical rainfall intensity data for a specific location that can be downloaded easily. I have found this (http://www.srh.noaa.gov/ridge2/RFC_Precip/) on NOAA's site and it's perfect honestly; you can look up a specific area and then see the...
  2. Kowycz

    Flow Measurement

    Is it possible to calculate the flow rate entering a pipe by merely measuring the depth of the fluid entering it? The pipe is gravity fed. Initially I began researching circular weirs however after further thought there isn't a crest present allowing for free fall to occur.
  3. Kowycz

    Yard Hydrant Manufacturer

    Does anyone know of a company that manufacturers 1.5" hose connection yard hydrants?
  4. Kowycz

    Scum Management

    I am currently working on a WWTP upgrade and my supervisor and I are running into a problem deciding what to do with the scum out of the primary clarifiers. Currently the scum is skimmed into a trough and routed into a "scum concentration box." Once the grease and scum coagulate the material...
  5. Kowycz

    CMU Vertical Reinforcement Design

    I am currently designing a small CMU building with exterior load bearing walls that surpass the IBC's lateral support requirements (2109.4.1) The code states that load bearing walls (non solid units / not fully grouted) not exceed a distance of 18 times the thickness. 8" CMU Block X 18 = 144"...
  6. Kowycz

    Concrete Tank Slab

    I am currently revising a concrete clarifier slab thickness and reinforcement. The clarifier is being relocated on the site from a poor soil condition location to a relatively good soil condition location. We are in the process of getting new bore holes drilled in the exact location; however a...
  7. Kowycz

    Concrete Water Channel Design

    I am currently trying to design a concrete water channel for a headworks building. I was just wondering what the best approach for this situation was. Initially I thought designing the channel much like that of a retaining wall would be the best approach. However I came across the PCA's...
  8. Kowycz

    Cocnrete Equipment Pad Design

    I have been unable to find any information on equipment pad design. I was interested in knowing what the proper procedure might be. Initially I thought you would design it similar to an isolated footing; however I would imagine there are lateral loads in relation to equipment vibration. I was...

Part and Inventory Search