I am designing a subdivision and the first thing I am doing is laying out the streets. I am matching the proposed street as close to the existing grade as possible. Next, I am creating offsets for the Edge of Pavement(-0.25'), Back of Curb(-0.08'), and Back of Sidewalk(+0.25')lines. The...