i was assigned with a project to design a precast foundation for a drilling rig.
the tower of the rig, the hook load is supported by a truss substructure which lies on concrete foundation.
because i need to design it precast, i am constraint by dimensions (not to exceed the foundation weight...
Hello,
I have a problem with designing precast concrete beam of boomerang shape. If you are not familiar with the shape, i attach the picture of it. The problem is finding moment diagram. Solving by hand, i get max moment at the mid section as for normal beam. However, i tried to model the beam...