Hi,
I am designing a composite beam with a 5/8" gap between concrete and top of steel beam.
I have 8" concrete slab. I am considering the following factors in design:
1. Bending of studs; and
2. slippage of concrete vs. steel.
Any other things I should consider?
Thanks