I have a simple timing application that the customer wants to solve with an Automation Direct CLICK PLC. I need to "measure" the time difference of two different discrete inputs. The expected time gap will be from 0 to 60ms. I know that resolution will be a function of scan time, since there...
I'm designing a SCADA system that will have only two terminals, a PC in an office, and another "screen" on the floor, both talking to a ControlLogix PLC. I'll be using A-B Factory Talk SE, with a Station edition running on the office computer. I have two options for the floor "screen"; a...