I am reviewing a failure of an anchored sheet pile wall (14 ft retained ht) along a river where the designer assumed medium dense conditions at the toe of the sheet but let the contractor stop the sheets in very soft clay, 5 to 10 feet above the actual top of the med. dense material. The wall...