Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. abuanaselmasry

    Question|| Creep Limit & Creep Consideration ASME BPVC VIII-1

    I'm designing now a heating coil of SA-333 6 material that works at 375°C. By checking ASME BPVC II-D(M); Table A1 Note T-1, Allowable stresses for temperatures of 370°C and above are values obtained from time–dependent properties. The coil will work under this conditions for 24 hours every...
  2. abuanaselmasry

    Skirt Base Block Check for Two Lugs

    It is agreed that Roark's formula (7th edition) Table 9.2 Ref. No. 1 is not applicable for base block check in case of single tailing lug. Ref. No. 20 is the one that is commonly used by design software packages. But, in case of 2 tailing lugs, what should be the case? Ref. No. 4 is used by...
  3. abuanaselmasry

    Heating Coil Bundle Support Conditions

    I have a heating coil of 3 m length. It is mainly 2 pipes but bended into 8 flows with only 4 ends welded to the cover of the heating coil insertion nozzle. In order to provide the necessary moment of inertia and to enhance the rigidity of the bundle, I have utilized a longitudinal stiffener...
  4. abuanaselmasry

    Advice is Required || ASME BPVC Section I Design Software

    I'm currently looking for a software which can perform the design calculation for the drums fabricated per Section I. I'm still surprised that PVElite and COMPRESS doesn't provide this service. Looking for your helpful replies. Regards, M.Salaheldin Static Equipment Mechanical Design Engineer
  5. abuanaselmasry

    Ellipsoidal Head and Shell Joint Effeciency.

    I have a littel confusion with Compress concept with estimating the joint efficiency due to RT applied to Cat-B welds in 2:1 Ellip Heads and Cylinders. Suppose; Case 1: Head is seamless, RT for Circumferential weld between head and shell is Spot, and Shell is also Spot. What should be the E...
  6. abuanaselmasry

    PV with SW Connections Hydrotest

    Our client insists to have a socket weld coupling as a temperature gauge nozzle in NPS 1 or less Size. My question is; Does any one have a past experience with this nozzle end configuration? How was the hydrotest conducted? Is there any code reference to allow opening and welding these...
  7. abuanaselmasry

    Double Walled Pressuer Vessel Certification

    Dear All; I have successfully designed a Jet-A SS double walled pressure vessel and hydrotested. The internal vessel is the main vessel. The outside vessel is for leak detection as well as will work as a standby vessel in case of the failure of the internal vessel till the maintenance or...

Part and Inventory Search