Hi guys, I have a small project which must be finished by 56 calendar days, is there anyone who can guide me through preparing the necessary steps to schedule the project? Also is there any difference in preparing for scheduling the project by CPM or Primavera Project Management software?
I know that concrete needs some time to hydrate; therefore (compressive strength test specimens or cubes) are placed in water for 28 days (at that time concrete reaches 90% of its total comp. strength) and then tested and the results are usually used in design, BUT the structure itself cannot be...