Hi Guys,
I have an interesting problem I was hoping someone could help with me.
We have been asked to evaluate possible sewer construction methods through a landfill site. The landfill site comprises of fill which ranges in depth of 8 feet to 50 feet.
The fill is non compacted and consists of...