Hello,
I have a general question about drawing arrangement for assembly tooling and fixture drawings. This may have been covered in previous post, but I wasn't able to find it.
I have seen test/assembly fixture drawings done a couple of different ways. Some drawings have all required...
Hello,
The company I work for is currently reviewing our drawing release and revisioning processes.
I know that it is widely acceptable to have 2-3 different release levels such as preliminary, prototype and production. I also have seen different schemes for differentiating between these...