I need to install about 200, 40ft long, sheet piles in soft clay. Sand fill for the first 3m then clay with SPT numbers from 1 to 5 for the next 60ft. Local knowledge indicates the clay is quite resistant to vibrated sheets. I would like to avoid the noise of hammering, and avoid the cost of a...