I was recently sent a cad file of a layout for a new building.
I was asked to survey the as built concrete columns and walls to see if they are in the correct position.
I did this and overlayed my survey unto the layout i was sent. Both in dwg format.
For some reason which i cannot understand...
Can anybody help me, i have autocad 2010. I have been using a po2txt lisp app
to harvest survey co-ordinates from the autocad drawing and recording them on a text file.
Instead of been able to click on a mulitple points and recording them all in on go.
i suddenly find i can only record one set...
Can anybody help me, i have autocad 2010. I have been using a po2txt lisp app
to harvest survey co-ordinates from the autocad drawing and recording them on a text file.
Instead of been able to click on a mulitple points and recording them all in on go.
i suddenly find i can only record one set...
I have just purchased a topcon 9005A robotic EDM with Fc200 field controller.
I will shortly receive instruction on its use from the topcon rep, but in the mean time does anybody know how one imports DWG files to the Field controller
Does anyone know if you can compute earth work volumes using autocad 2006. I have just completed a survey of soil and muck shift. Can i compute the amount of muck taken off site using Autocad.? I know i can compute areas, but not sure about volume for something like this.
i have written a spread sheet to convert rectangular coodinates to whole circle bearings, using ATAN2, but i always get a minus or a positive bearing from 0(ie north).
i need to somehow convert that to a true whole circle bearing.
i am not very up on excel, can some one help?