  1. IceVol

    Drilled Pier Cold Joint

    A Contractor of mine poured the first 25 feet of a 3' dia 30' drilled pier foundation designed to support a steel lattice transmission structure before he realized the foundation was off by the correct drilling location by about a foot. Construction halted and the top 5' haven't been poured and...
  2. IceVol

    Foundation Encasement

    I have an issue with an existing tower built in the 70's. The foundation has some severe spalling (don't know if thats a good word, but its what we call it around here...i.e. flaking deterioration of the concrete) likely due to poor air content in the mix. I have cored the foundations and...
  3. IceVol

    Aerial Taps

    So I'm fresh out of school and learning the transmission trade. My boss is on vacation. I'd like to come up with a solution before he gets back. I've been working on a project where a 115KV line on H structures must go under a 161 KV line and then over a bridge at a 90 degree angle and 40'...
  4. IceVol

    Concrete anchor bolts in tension

    I am digging through the ACI code D.5.2.1 (Concrete breakout strength) to see if a group of anchors can handle a massive 40K force. The answer is probably not, but I am having difficulty decipering the Ncbg formula to prove it. It looks somthing like this Ncbg= (Anc/Anco) (Psi ec), N (psi ed)...