    Estimating Wastewater Flows...

    We are working on a sanitary sewer project that will serve approximately 1600 acres of land intended to be industrial development. Based on some quick research it looks like 1000-1500 gpd/ac (light industrial), 1500-3000 gpd/ac (medium industrial) and 1000 gpd/ac (Infiltration) are fair...
  2. VAEOhio

    Interconnected Pond Modeling Question

    Hi there, I am currently working on an interconnected pond design that is giving me some trouble. Here is the basis of the design... I have two ponds, both of which will be wet with a constant water surface elevation. The two ponds (northern & southern) are seperated by an existing drainage...