    Brick facade repair methodology

    Have been asked to evaluate an ongoing facade repair project, which requires removal of veneer along the floor slab edges for shelf angle and flashing repairs. I observed that the contractor is supporting brick above areas of removal with short 2x4 "cripples" spaced 3 to 5 feet apart, and my...