When working with a driveway where the slope isn't parallel to the travel lanes, is the preferred orientation of a trench drain to follow the contours or to run perpendicular to the travel lane? The rational for placing it along the contour makes sense, just wondering if there is a reasonable...
When calculating time of concentration, how do you account for a detention pond?
My site drains to a small creek and the proposed development includes a small pond through which most of the site will drain. I'm thinking the most appropriate point at which to calculate the time of concentration...
I found a solution to a similar problem on an old thread but couldn't work the procedure to correctly solve my problem. Any help with the following problem would be greatly appreciated.
I have an underground pipe system that will be used for storage and would like to assemble a stage storage...