Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: vds002
  • Content: Threads
  • Order by date
  1. vds002

    Weird Transformer Load Configuration

    One of our heaters has a transformer that had load connected between primary and secondary windings. Can anyone give any thoughts on what does this type of connection mean... any ideas would help...
  2. vds002

    Scruber Controls

    Hi All, I was wondering if anyone here has any experience controlling a scrubber. In our scrubber vapor at 175C is scrubbed with liquid at 27C. I am controlling the level inside the scrubber by manipulating the liquid in. Is this sufficient or do i need second degree of freedom by controlling...
  3. vds002

    Heaters on One line diagram

    I have couple of 1.1 MW, 480 V heaters that I need to show on single line diagram. What symbol should I use. Can I just use a box and write Heater in it. Or Should I draw a box and write SCR controller in it and connect a circle to it and write 1.1 MW heater in it. Any suggestions...
  4. vds002

    Heat Exchanger With Refrigerant As Cooling - How To Control

    I was wondering if anyone at this forum has ever came across a heat exchanger which uses refrigerant as a cooling medium. I had a few question about how to control the cooling. 1. Do I need to measure the refrigerant return temperature and control the refrigerant inlet valve? 2. Do I need to...
  5. vds002

    Distance from Flange to Pipe

    Can anyone give me the following info: (PIPE SCHEDULE 80, Carbon Steel, Flange RF CLASS 150, Process TEMP 100 C, Pressure 7 BAR) 1.For a 1 ½ Pipe with a 1 ½” Flange welded on it- what would be the distance between the pipe and the flange. 2.For a 2” Pipe with a 1 ½” Flange welded on it- what...

Part and Inventory Search