Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: xxmaqxx
  • Content: Threads
  • Order by date
  1. xxmaqxx

    Design of a continuous frame

    Hello SAP2000 colleagues, I have a casted-casted 10m length beam. I created joints in the position 0,2,4,6,8 and 10m , then I created 5 frames (2 m. length each) connecting these joints with a IPE 270 cross section. After this I assign loads to the joints. I am designing with AISC and would...

Part and Inventory Search