We have a one-story office building, masonry and timber truss, just under 10,000 square feet, built in 1977 but considered by the jurisdiction to fall under the 1990 UBC.
There are no sprinklers in the building, and we are planning tenant improvements to remodel the existing office space over...
Assume an existing rectangular concrete flume,
slope varying from 0.020 to 0.040, width from
12' to 24', vertical wall height from 3' to 12',
overall length 2500'. ACE-style "channelization".
Plan to construct and install precast weirs at
average 25' oc, bevel-face, vertical back...
Our firm has in the past provided schematic
shop drawings to clients, to assist in their
takeoff and estimating for construction bid.
We're looking to streamline our operation
and out-source that service to a CAD shop.
What is an appropriate cost structure for
taking structural layout drawings...