Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: doka1
  • Content: Threads
  • Order by date
  1. doka1

    Corbel Reinforcement

    https://res.cloudinary.com/engineering-com/image/upload/v1659814414/tips/Corbel_Detail_iuforr.pdfDoes it matter if the main reinforcement of a column corbel turns up into the column vs down into the column as usually shown? Closed ties and framing bars are installed as usual.
  2. doka1

    Two-Way Slab-Order or Rebar Placement

    I am working on small footprint 2 way slab 30" thick, surrounded by walls around the entire perimeter, essentially making a concrete vault. The spans are 29'7" and 24'....The plan dictates #9 at 12 o.c., top and bottom, both directions. The section illustrates the rebar in the 29'7" direction...
  3. doka1

    Concrete column against existing building

    I work for a concrete contractor that is installing the foundations for an addition to an existing masonry bearing walls and timber beams building. We installed a small portion of wall and a 2'x2'x10' concrete column against the existing masonry without compressible filler or fiber expansion...
  4. doka1

    Bridge Deck Placement Sequence

    I understand most DOT's specify placing the positive moment regions first followed by negative moment regions (3-7 days later) to avoid cracking in the negative moment regions. I have witnessed a deck being placed continuously with only the stipulation that a specific rate of placement be...
  5. doka1

    Modifications to cast in place garage

    I am a superintendent for concrete construction and have come across the most bizarre design team. The project is pretty straight forward and involves a concrete topping slab that ramps up. The topping is on top of an existing cast in place concrete parking deck (one way slab). The topping...
  6. doka1

    bent anchor bolts

    I am a foreman for a concrete contractor on a 5 story steel structure building. The steel is being erected with 3/4" f1554 gr 55 anchor bolts. During the installation of the underground plumbing the plumbing contractor bent several anchor bolts. Of course bolts were bent to different degrees...

Part and Inventory Search