Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: moebius4
  • Content: Threads
  • Order by date
  1. moebius4

    Transitioned Drawings - Significant Drawing Numbers

    1. Our Company has transitioned many TDP's from several companies. We always add a transition statement to the first sheet of each drawing and bump the revision letter. 2. We have some drawings from a particular company that used a significant drawing numbering and part numbering system. 3...
  2. moebius4

    Bind an Image into a DWG

    Is there any way to bind a raster image into a drawing similar to binding a *.dwg XREF? I don't want to have to keep the *.gp4 and *.tif files along with the *.dwg file. Bind isn't a selectable option when you right-click on the raster image reference. It is if the XREF is a *.dwg file.
  3. moebius4

    Find Number Ballons - Quantity Required

    ANSI Y14.100 and DRM state to use QTY REQD next to a find number ballon to indicate the quatity for the callout in the body of the drawing. We all agree to this practice here. Ex. For an assembly that requires a bolt, two washers and a nut, we would show 3 stacked ballons with "2 REQD" next to...

Part and Inventory Search