Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: EPSTR
  • Content: Threads
  • Order by date
  1. EPSTR

    Framing members in plywood shearwalls

    Using the 2000 IBC code and current NDS standards. Can built-up 2x members be substituted for the situations where a 3x member is required per code to achieve the allowable shearwall design values? i.e. (2)2x6 studs in place of a 3x... this would ofcourse assume that the built-up studs are...
  2. EPSTR

    Design of built-up W sections for combined torsion and bending

    A current project in our office has required us to size a very large W-section. A height restriction of 24" has been set by the architect to make the beam more "interesting" for us. The beam spans 45' and with its cont. and point. loads must resist a 154K-ft moment. We have just...
  3. EPSTR

    Torsion properties of Built-up W-sections

    A current project in our office has required us to size a very large W-section. A height restriction of 24" has been set by the architect to make the beam more "interesting" for us. The beam spans 45' and with its cont. and point. loads must resist a 154K-ft moment. We have just...

Part and Inventory Search

Back
Top