Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: tweeky
  • Content: Threads
  • Order by date
  1. tweeky

    shore power supply to vessel

    I work for a ferry company with 30 ships. All our ships have a three phase 440v insulated neutral system. So basically the neutral terminal at the generators are not used, with only the three phase wires going to the main breakers in the control room. The ships hull is being used as a 'floating...
  2. tweeky

    shore power earthing

    I work for a ferry company with 30 ships. All our ships have a three phase 440v insulated neutral system. So basically the neutral terminal at the generators are not used with only the three phase wires going to the main breakers in the control room. The ships hull is being used as a 'floating...

Part and Inventory Search