Hello All,
I'm currently working on a project requiring erosion protection. We have a 1.2m dia culvert discharging 3.7m3/s to a channel, 120m long @ 5.0% grade, 2.0m bottom width, 2:1 side slopes, approx 1.8m deep. This channel has an abrupt transition to approx 0% near the outlet to a...