  1. analystuc

    Output Flowrate for three nozzles operating in a hydrant system

    We are in the process of installing a fire hydrant system. Our client wants to know the output flowrate for three hose nozzles operating at the same time. Whats the best approach for this? Any tip is appreciated
  2. analystuc

    Pipeline CAPEX Estimation

    My firm wants to build a gas pipeline, to supply a number of process plants. In my country, all gas pipelines belong to the national gas regulatory body. We proposed to build a pipeline in exchange for gas. Thus, there was need for both sides to come up with CAPEX estimates that would be agreed...
  3. analystuc

    How to get a load profile

    Please I am not conversant with electrical systems. But I was asked by a power plant vendor to provide an electrical load profile for a fertiliser plant to enable them to select an appropriate power plant configuration. How and where do I start from.
  4. analystuc

    Best Plan for 100MW Gas Turbine Power Plant

    Please my organisation is intending to build an industrial park, that will consist of fertiliser, methanol and ethanol plants, with a combined power requirement of 100MW [redundancy included]. We are looking at gas power turbines as a power source. Currently, we need a 'best' plan for this...