Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Upasena
  • Content: Threads
  • Order by date
  1. Upasena

    Incremetally Launched Box Girder Bridge-Shear of Cracked Section

    Dear Sirs, I am working on the design of an incrementally launched box girder bridge whose parameters are as follows: 2Nos. End spans 26.5 m each. 4 Nos. Internal Spans 46.5 m each. All bearings are laminated elastomeric after launching. During the launching Teflon bearings are used to minimize...
  2. Upasena

    Lateral Soil Pressure on RC Pile

    May I request for some advise on a pile design? I have a case where 3m of earth filling is coming below the pile head. (Abutment) On the right side the gravel fill extend to a long distance horizintally. On the left side earth is sloping towards the river at 1:1.5 (vert:horz.) Pile diameter 1.4...
  3. Upasena

    BEARING PAD DESIGN FOR HORIZONTAL LOADS

    Upasena (Structural) 26 Sep 08 13:44 I have a bridge with 4 elastomeric bearing pads on the left bank with movement restricted along the axis of bridge. The Service Horizontal force on one bearing is 2300 kN (Max),Laminated Bearing Pad is 700mm x 600 mm x 83 mm thick. To maintain fixity in...
  4. Upasena

    DOWEL PINS TO RESIST HORIZONTAL LOADS IN ELASTOMERIC BEARINGS

    I have a bridge with 4 elastomeric bearing pads on the left bank with movement restricted along the axis of bridge. The Service Horizontal force on one bearing is 2300 kN (Max),Laminated Bearing Pad is 700mm x 600 mm x 83 mm thick. To maintain fixity in the required direction I need 2...

Part and Inventory Search