Guys – Need your help in selecting right sized Lightening Arrester.
I have to select an L.A. for the Primary of a substation transformer which has delta connected Primary at 115 kV. This substation transformer 115kV, Delta-Primary/ 23kV Secondary Y-solidly grounded, is being fed by a utility...
Hi Guys
I am calculating Cable Ampacity of 8x3C-750 MCM cables that run in free air for around 20 feet and then enter into a trench that is around 19 feet long. One end of the trench is open and the second end opens up in a cable pit. Cables occupy less than 12% of the trench area - so around...
Gents
I am working on Cable Ampacity Calcs on EDSA software. Three single phase cables are going to a transformer and three out going feeders (9 cables-single phase cables) are placed in a concrete duct bank - all cables have concentric neutral wires for return current. The cables are designed...