My firm is doing a water treatment design for a fire dept's draft tank. This tank hold 10,000 gal of water to be used to test the water pumps on the fire trucks. Water is pumped out of the tank, through the truck and back into the tank. They do this about once or twice a month, maybe. The tank...
We are currently working on a military job which requires us to install security bars at every wall penetration. My boss has tasked me with finding the air pressure drop across each security bar section. Needless to say, there are a lot of wall penetrations.
The bars are 1/2 inch steel at 6...