Hi all,
what do you call something like this:
after installation and piping of equipments, you close some valves so that you have a closed system with some equipments connected.
Then from the highest point of the system you apply a certain pressure to see if the welding etc are tight.
Do you...
Hi,
is it normal to order a tubular heat exchanger with 5/8" O.D. tubings in the US? Do the vendors have to procure them specially so that this will make more cost than ordering a heat exchanger with 3/4" tubings?
Thank you in advance.
Hi all,
my questions might be common sense for you all, but for me as a non US, some questions pop up in my head.
My questions are about how people in the US usually writing the specifications for tubing in tubular heat exchangers. I need to write technical specifications for inquiries.
1...