We have been planning replacement of complete economizer banks in 500MW boiler of 25 years old. We planned sponge ball testing for thoroughness check of new coils before welding. Chemical flushing ( DM filling and ammonia dosing for up to 9.5 pH)of new banks after complete erection. Please...
100kW Solar PV system Connectivity is proposed as shown in the diagram. Grid Connectivity to a module with 200 Amps fuses at 415 v Swgr (at 'B') is proposed. 415 V MCC is highly important swgr located in a power plant. The question is what can be the best way of connectivity at 'B' so that any...