I have to design/build, lift and install offshore, a trussed arrangement. The requirement is to have a box of 1.2 m wide and any suitable depth. So, I have come up with two trussess spaced at 1.2 m and depth of 400mm (something like steel joists). To minimize weight and as per requirement, the...