  1. txdilbert

    Steam Main Drip Trap Discharge

    Any cost effective way to pipe a medium pressure steam trap discharge into a pumped condesate return line? Or are folks still just simply creating site leaching wells to handle this discharge?
  2. txdilbert

    Boiler Attendance Requirement?

    Boiler Experts, I have been involved in discussions about whether there is a national code or rule that requires building-level boilers above a certain heating input to be constantly supervised by a qualified on-site person, capable of responding to an alarm condition in a responsbile manner...
  3. txdilbert

    Pre-Eng Metal Building

    Guys, Have a customer that wants to erect an 80' x 60' x 20' pre-engineered metal building on an existing 100' x 100' monolithic concrete slab to control cost. Core samples suggest the slab was poured at 12" thick(?), with no reinforcement. Unclear what type of concrete mix was used. Since...
  4. txdilbert

    Boiler Hydrostatic Testing

    Guys, Looking for some direction on this. The organization I work for requires that boilers already in operation receive hydrostatic testing every year if steam or high temperature hot water. I have read conflicting information regarding the test pressure the boiler must be brought up to...
  5. txdilbert

    Dining facility HVAC

    Is it common practice to provide direct mechanical cooling for a kitchen area in a dining facility? Or, is kitchen worker comfort generally accomplished by air being transfered to the kitchen from the dining area because of the negative pressure in the kitchen? Would it be a bad idea to...
  6. txdilbert

    Redundancy with common duct system?

    What is the typical approach method we use when attempting to provide redundant floor-mounted indoor air handlers if only one duct system will fit in a space? Are they stacked and ducted together at the supply and return flanges? Do we provide duct-mounted motorized dampers to minimize the...
  7. txdilbert

    Humidity?

    Entry level question here.. Would humidity levels be a concern if the OA requirement is 10% of building supply air and the RTU is not oversized? (Assuming a constant OA requirement during occupancy and no reheat)