Hello all, What are the big differences when it comes to modeling culverts vs. bridges in HEC RAS. I browsed the Army Corps manual and did not pick any. What am I really missing? thanks
In the past I have designated a fence as if it were a guardrail. These fences have been a continuation of the guardrail in place. This particular fence cannot be considered a guardrail as it is not a part of the structure. The bottom of the fence is suspended above the stream channel. It...
I am not sure how the Regional Service centre evaluates coastal studies ...where can i find a quick refresher on the requirements on the map and FIS?
Also, the lakes studied have transects but are labelled as AE and not VE..Would this be correct?
thanks
Hello all,
App J, section 4.1 of the FEMA Guides and specs requires the county to include the scale and contour interval of the source map data. However, the work I am looking at right now only states that 'the floodplain boundaries were delineated using a 1-meter cell size grid created from a...
I am seeing a couple of answers in the NFIP FAQ...If the LOMR is for a previous study that already has a floodway then the allowable increase is 0.00 foot. However, if the previous study has no floodway then the allowable increase is 1.0 foot (if allowed by local ordinance)?
Is this a correct...
I am working on a CLOMR application for a client. My report is based of the requirements in the NFIP 65.12 regulations. I am attaching my MT2 form as attachment to my technical data package. I am unsure whether it is the applicant (client or contractor-me in this case) who fills out the MT2 form...
I was wondering if any of you would have a good link to a website which kind of boils down how each program works and how they communicate with each other. I use a lot of H&H softwares such as Hec-1 and Hec-ras, HYDROCAD, WSPG, WISE tools, WMS & supporting mapping tools such as Arc and Autocad...
I have ineffective areas shown on certain cross sections for my 100 yr boundaries. Would this need to be included while drafting the 100 year floodplain?
thanks
I have reviewed projects done for FEMA, mapping the 100 and 500 year studies by different contractors. I have seen models turned in been run with 'Supercritical' flow regime and 'Mixed' flow regime. So my 2 questions are:
1) Does FEMA guides and specs favor any time of run? I do not recollect...