What are the factors to consider to determine the cause of failure of boiler steam drum gasket during testing of safety valve at 1450 psi, our normal working pressure is 1350 psi.
Hi all
Is there a code, procedure for welding on an in-service AST diesel oil tank. We are installing fire protection around these tanks in the form of fixed water spray cooling rings & foam top surface discharge. The need for welding is for the brackets that will support the cooling rings.
I...
We are designing a submarine pipeline to transfer heavy fuel oil from a off-shore mooring. Does anyone here has a reference chart on the viscosity of HFO no. 6 (bunker c)at various temperatures. We are aware of the temperature at offload and the related viscosity, however after pumping, and some...
We are designing a submarine pipeline to transfer heavy fuel oil from a off-shore mooring. Does anyone here has a reference chart on the viscosity of HFO no. 6 (bunker c)at various temperatures. We are aware of the temperature at offload and the related viscosity, however after pumping, and some...
We are designing a submarine pipeline to transfer heavy fuel oil from a off-shore mooring. Does anyone here has a reference chart on the viscosity of HFO no. 6 (bunker c)at various temperatures. We are aware of the temperature at offload and the related viscosity, however after pumping, and some...
Hi All
Is there anyone here whom have completed the PMI course - Certificate in Applied Project Management offered through Boston University?
Secondly, if you are charged with a project to develop a methodology to launch and open field offices for a worldwide distributor, what would be the...
What would be the best method to de-oil a 10 inch diameter, 2250 meters long length of submarine pipeline filled with #6 heavy fuel oil. The pipeline is being decommissioned & removed from service.
Taking cost effectiveness & environmentally friendly into consideration
In the pictures attached, I have concluded that this failure is a tensile uplift due to the dynamic loading. The foundation system is a pile supported pier. It cracks along the top edge perimeter including vertically at the vertical edges/corners. Your comments on the failure as well as a...