Hi all, I need some help yet again. How does one calculate
1.the volume or gravel / slurry required to fill the hole in a gravel pack
2.the volume of brine required to complete the well
3.volume of base oil needed
Hi all, I'm a completions engineer trainee and I really need some help. I know the basics, how hydrocarbon is produced, parts of a rig, how to read reports. The problem is if I am to design a completion I don't know where to start calculating amount of tubing, propant, brine, base oil. I'm lost...