    Overpressure caused by Fire

    Hi Guys I couple months ago I had some conversation with my lead engineer regarding the maximum relieving pressure for fire sizing. In my relief calcluations for fire case I used 21% of overpressure,which was crossed and replaced by 10% by my lead. So when I asked him why it was changed to...
  2. Idontknowit

    Vacuum Purging

    Hi guys, Any tip/reference/advice/procedure on common vacuum purging will be very appreciated. Thank you Idontknowit
  3. Idontknowit

    Evaluate carbon dioxide versus nitrogen as a purge gas

    Hi folks I need your advice in evaluating nitrogen against carbon dioxide as a purge gas. It is small test rig with dimensions 2x6 meters.The purging method is based on drawing vacuum. Also there is possibility of moisture in the system.Any tips how to eliminate this before or during the...
  4. Idontknowit

    Recommended maximum vessel wall tempereature

    Hi I need to find out what is the recommended max.wall temperature of the vessel (material: Stainless steel AISI 304L) What is the criterias to determine it(time,type of fire,etc)? All comments are very much appreciated? Idontknowit
  5. Idontknowit

    sizing psv for expander

    Guys, I have request from the client to perform PSV for Expander which is simply piece of pipe larger diameter downstream of the high pressure vessel filled with gas. My question is should I make psv sizing calculation for this expander with size 1,5mm x 25mm as I have already sized the PSV...
  6. Idontknowit

    Purge rate

    Hi Folks, Any tips/references on how to calculate purge rate for small scale test rig will be much appreciated(consists of receiver tank,high pressure reservoir,gas expander,test section,intermediate low tempereature pressure tank) ?