A project I am currently working on is trying to obtain LEED certification, and the LEED consultant is requiring (or desiring) that I spec 16+ SEER, 9.0 HSPF units. These are townhouses, and the loads for half of the units fall between the capacities of a 2T and 3T, so 2.5T is a better fit...