I don't know if this forum is more proper for this question than in the power Engineering forum I did it yesterday.
As per my Manager instructions I always sized up a drive isolation(voltage match) transformer for continuous operation based on KVA load demanded from the controllers for...
As per my Manager instructions I always sized up a drive isolation(voltage match) transformer for continuous operation based on KVA load demanded from the controllers for continuous mode S1 operation, controller load in some cases were bigger than drive HP. Now my Manager have instructed me to...