Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: ballenEEUK
  • Content: Threads
  • Order by date
  1. ballenEEUK

    PVC Conduit in a Class 1 area

    Hello, one of our clients use Gas chromatographs, while installing one the manufacturer instructed us to us PVC schedule 80 4" as a sheath over the gas sampling line between the gas supply line and chromatagraph. Since we are not sending power through the conduit, except heat tracing, can we...
  2. ballenEEUK

    Positive Pressure Control Box

    Hello everyone. I have a client who has a Natural Gas liquids facility at their compressor station. The control box for the NGL plant is a postive pressure box, fresh air is pumped in to prevent flammable gas from entering. They have decided to remove the air system and use power gas and to...

Part and Inventory Search