In specifications for fabrication of steel structures,I find one clause -" Bolted bracing length to be reduced by 1/1000 for draw", I did not understand this meaning.Kindly elaborate anybody ?
In specifications for fabrication of steel structures,I find one clause -" Bolted bracing length to be reduced by 1/1000 for draw", I did not understand this meaning.Kindly elaborate anybody ?