I am using ETAP for grounding grid simulation. Very shortly, we are arranging for the resistivity tests and I have done some reading to understand these IEEE approved methods. Most of the commercially available softwares including ETAP, SKM, WinIGS have two options:
1) Two Layer Model...
Hi,...
I am working on a basic feeder protection involving a new 10/12.5 MVA ONFA 69/13.8 KV transformer. The %Z of transformer is 6.4%. I am using ETAP for simulation. Now,
When I have to input the value of inrush current, the typical value is 12 times I(full load current). Now what I am...
Hi,
I am sure many have answered this before:
Is this thubm rule or there is a logic behind this assumption:
1. Low resistance grounded system: 0-25 A
2. High resistance grounded system-25-600 A
Will it be correct to say, if I limit my ground fault current to 50 A, it will be a High...