Is it possible to dry out a 300mm thick 30MPa concrete slab with a 25mm polystyrene layer and 75mm screed on top already in position? Area under question - approximately 70m^2. Being an HVAC specialist, the engineer asked me - all I can think of is to de-humidify and heat the air below the slab...
Dear fellows,
I am designing a system with common hot and chilled water piping with seasonal changeover. The pipe runs are quite long - about 60m (exposed to ambient conditions). Does anyone know of any special precautions one should take except for linear expansion and proper thermal...