I'm doing some research for a new project, and would like to get some input.
The project is calling for a 36" sewer force main to be constructed INSIDE a large underground transport/storage structure (~17'w x 30'h). Tentative plans are to place the new FM atop the 2'x2' struts that run at 12'...