Hello All, One of our high voltage combined instrument transformers has failed and has to be replaced. I am trying to figure out a way where the secondaries of the remaining two CIT's could be used to create voltage and current for the missing unit for a balanced 3 phase power system.
Will...
All,
I have been asked to look into the probability of Main Power Transformer (230/35kV) failure should one be implemented without high side arresters. The thought process behind this is to figure out the affect of energizing a transformer without an arrester due to lead times of the...
What type of cables does this section applies to? Does it apply to instrumentation cables, which are covered under 727? What's the purpose of this limitation?
Any suggestions will be greatly appreciated.
Does anyone know of any chart, code or standard that describes minimum metal to metal spearation for different high voltages during switching to avoid and arc? I have read some references where it talks about accounting for 1 ft per 110kV, but am not sure where that number came from.
I am trying to figure out a way to get KYZ pulses from a revenue meter into a SEL3530. I am therefore looking for a middleman relay that would take KYZ output from the revenue meter and then convert that info. to a serial modbus or DNP communication to take over to a SEL3530.
Any suggestions...
Does anyone know if there's any US standard or code that dictates what the oneline symbol for Capacitive Voltage Transformer (CVT) should be?
I have always seen one with a drain coil in it and know that drain coil should be for CCVT and not CVT.
Do any one of you has a copy of Ralph Lee's paper on application of rolling sphere lightning protection method they wouldn't mind to share?
Please don't bother with a generic reply such as go find it in IEEE archives etc. unless you know specifically where.
Thanks again.
Good morning All,
I have an application requiring three of my air conditioner loads to start in step in order to avoid having to buy a bigger size emergency generator.
my three airconditioner loads are as follows:
-240V 60A single Phase AC
-240V 60A single Phase AC
-240V 30A single Phase AC...
I have following information on 120/240V loads
MOTOR STARTING + CONTINUOUS LOADS
Single phase – 120 kVA
Three phase – 51 kVA
MOTOR RUNNING + CONTINUOUS LOADS
Single phase – 104 kVA
Three phase – 12 kVA
AFTER 10 SEC (CONTINUOUS LOADS ONLY) KVA
Single phase – 97 kVA
Three phase – 6 kVA
I would...
Does anyone here know the fault withstand rating of EHS steel conductors?
Even if you can provide me with Kf and Fusing Temperature values to use from IEEE 80 - Table 2 it would be a tremendous help.
Thanks
Does anyone here know where I could find specs/document describing how this Westinghouse live tank breaker operates?
I need to know at what point does the compressor motor starts and when does it stop.
Thanks in advance.
I have a situation where I need to feed two 30A branch circuits off of a 120/240V single phase transformer.
The panel board is to be located outside. Does anyone know of a small panel board / breaker box that can be used to serve just two branch circuits?
I have a fuse and conductor sizing problem I need help with:
Problem:
MOTOR
Quantity: 32 motors
motor size: 1/3 hp
FLA : 3.6 A @230V
LRC : 14 A
connected phase to phase
SERVICE
240V THREE PHASE SERVICE.
I am trying to determine what size conductor and fuses to use for circuit protection...
I tried this question under another subject line and received very few responses so here we go again. We have a situation where personnel are experiencing tingling sensation while touching equipment grounded to the 345kV switchyard grid. The voltage potential that exists is about 60V from the...
I am trying to find any research papers or articles on the topic of minimum phase-phase, phase to ground and particularly clearance above grade.
I know that for 138kV you need 13ft clearance above grade and for 345kV 18ft etc, but I don't know how these numbers are derived.
Any help or...