I work for a MEP consulting firm and our client wants us to explore using geothermal as an option. My question is do MEP firms sub out the well design (open or closed) to a certified geo-exchanged designer? Is it delegated design for contractor?
Do supply and return dampers on a mixing box for an AC Unit have to be physical connected using linkage? Is there a way to link them via motor controller?
If I have a LPS entering a coil, but I can not return by gravity. I have to pump the condensate pump back to the bfu, how do I calculate gpm.
Do I just find lbs/hr and then calculate using 1lb-water/hr = 8.34 gallons/lb-water x 60min/hr x SG
which gives me 1lb-water/hr = 500 gpm
or do I...
I have an office space with a CV AHU and steam radiators at the perimeter. The question I have is what is the LAT off the preheat coil during winter months?
*Assume the perimeter heat negates my skin loss!
*My mix air temp is 61F